We showed you how we installed the terrazzo tiles in the master and hall bath. Now, we will show you how the installation went in the pool bath, guest bath and the laundry room. Here is what the Level Quick looks like before setting the tile. You can see the pops of red from the Red Guard in the center left of the photo. Then, lay out tiles to find out how many you need, and to see where you need to grind down some of the Level Quick. Lay lines if you need to, then put down adhesive, and start laying tile. Lay more adhesive, lay tile, and press. No grout needed. Use a linoleum roller to make sure the corners and the tile itself adheres properly. Cut whatever else you need to fit, adhere, wait, then seal. Some of the easiest tile to work with.