As we mentioned in the previous post, we are having the flooring done by the folks at Tile Renaissance. While the majority of the house is going to be ground concrete, brick, and tile (bathrooms), the non-original part of the house (ie, the guest suite) we settled on concrete overlay. Here are pictures of the first layer. Obviously, this is not finished as of yet, but it was neat to see the beginning. They first ground down the black mastic that was left from the tile, then set the first layer of concrete. This is a vast improvement - remember, the entire room (bathroom included!) was white carpet. This type of surface will be much easier to clean (and less stinky!) than white carpet.
0 Comments
Your comment will be posted after it is approved.
Leave a Reply. |
About Us
In October 2016, Nathan & Rachel bought a 1958 Tom Gist custom home in the Mid-Century filled Wilshire Heights neighborhood in Tucson, AZ. This is our blog documenting the restoration! Archives
October 2017
Categories
All
|